Donate using PayPal

Gallery: The Tins path - narrow section

Along the narrow part of the Tins path from Railway Street to David Lloyd gym. At 2013 it is proposed to run a cycleway parallel to the existing path between Kathleen Elliott Way and Orchard Estate.

This gallery was created on Friday, 28th June 2013

The start of the Tins path at the Cherry Hinton end, off Railway Street

The Tins path east of and looking towards Orchard Estate. Rather overgrown this time of year, but is normally wider.

The barrier chicanes at Orchard Estate, looking towards town.

The barrier chicanes at Orchard Estate, looking towards town. A proposal at June 2013 is to install a new cycleway to the left of and parallel to the path opposite this photo. The first 10 metres alongside the brown fence is limited by the ... [more]

Land to the south of the Tins path west of Orchard Estate, where a proposal at June 2013 is to put a cycleway parallel to the path where the bright coloured ground cover is in the foreground.

The western end of the currently narrow section of The Tins path where it meets and looking towards the the wide part. The proposal at June 2013 is to build a cycleway from this point to the left of the fence on the left parallel with the ... [more]

The start of the narrow section of The Tins path. A proposal at June 2013 would take a new cycleway from the gate at the right and to the right of the trees, running parallel to the existing path to the SW

The wide part of The Tins path past David Lloyd gym.

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://margate.cyclestreets.net/galleries/234/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.